LPG / Central Gas Systems

LPG Central Gas Installation

Installing a central gas network is detail work: tank position and clearances, pipe support and protection, joint tightness and clear isolation points. We execute the network as one system from tank to last appliance and finish with a labelled network ready for testing, not one needing later rework.

Scope

Installation scope

  • Tank location preparation, base and setting
  • Regulators, filters and pressure reduction stages
  • Main and branch pipe runs with fixing and protection
  • Valves, isolation points and meters
  • Appliance connection with suitable flexible pipe
  • Gas detectors, solenoid valves and control panels
  • Labelling and access arrangement for maintenance and filling
Scope

Working in an operating facility

In operating restaurants and hotels we schedule the works to minimise kitchen downtime, carrying out tie-ins and isolation within agreed windows and re-testing before service resumes.

Deliverables

  • Installed and labelled network
  • Clearly identified isolation points
  • As-built drawing
  • Full readiness for testing and commissioning

Where this service applies

  • New villas
  • Restaurants and cafés
  • Central kitchens and hotels
  • Bakeries
  • Industrial facilities and laundries
FAQ

Frequently asked questions

Do you convert a cylinder kitchen to a central system?

Yes. It starts with an appliance survey, consumption calculation and tank location selection, then the network and safety systems are installed and tested before operation.

Who handles approvals?

We prepare the technical documents and drawings required by the authority concerned; submission is coordinated with the owner according to the project.

Have a project or an existing facility that needs an engineering review?

Our engineering team can review your requirement and propose a solution suited to the application, the site and the applicable requirements.

CallWhatsAppRequest a Quote