LPG Tank Systems
The tank is the hardest element to change later in a central gas system, so it deserves a decision based on consumption, site area, filling-truck access and clearance requirements. We help owners weigh above-ground against underground on practical criteria, then carry out site preparation, installation and connection.
Above-ground vs underground
- Above-ground: faster installation, easier inspection and maintenance, needs visible space
- Underground: frees site area and reduces visual impact, needs more careful site preparation
- Selection is affected by plot area and clearance requirements
- Selection is affected by filling-truck access
- Selection is affected by future expansion plans
Scope of work
- Capacity sizing from consumption and refill frequency
- Location, clearances and filling route definition
- Base or excavation preparation according to type
- Tank setting and accessory installation
- Connection to the pressure reduction stage and network
- Periodic tank and surroundings inspection within the maintenance programme
Deliverables
- Capacity and location study
- Installed and connected tank
- Filling access arrangement
- System documentation within the network drawing
Where this service applies
- Villas and residential compounds
- Restaurants and central kitchens
- Hotels
- Bakeries
- Industrial facilities
Related technical articles
LPG Storage Tanks
The role of the LPG tank in the system, its essential fittings, capacity and siting criteria, and periodic inspection needs.
Underground vs Above-ground LPG Tanks
A practical comparison of underground and above-ground tanks across space, cost, maintenance and site conditions.
What Is a Central Gas System?
An overview of the LPG Central Gas System — from tank to appliances — and why it replaces scattered cylinders.
Frequently asked questions
Which is better: an above-ground or underground tank?
There is no absolute better option; the decision depends on site area, clearance requirements, ease of inspection, budget and expansion plans, and is settled after a site survey.
Can an existing tank be replaced with a larger one?
Yes, where space and clearance requirements allow. The service covers site assessment and preparation, connection of the new tank and network testing before operation.
Have a project or an existing facility that needs an engineering review?
Our engineering team can review your requirement and propose a solution suited to the application, the site and the applicable requirements.

